Fiber Optics Training | LightMaster Training

Fiber Optics (LightMaster) Training

Introduction:

Fiber Optics Training | LightMaster Training Course Hands-on

We created this Fiber Optics Training | LightMaster Training course to meet the needs of system installers, technicians, outside plant personnel, and electrical contractors tasked with the important job of converting local-loop facilities from traditional copper to state-of-the-art fiber optic technology. An intensive five-day Fiber Optics Training | LightMaster training program, it consists of two days of theory lecture and three days of hands-on laboratory work. The lab exercises were created to simulate the actual field environment.

The Fiber Optics Training | LightMaster Training course may be used to prepare the participants for the Electronic Technician Association (ETA)’s Fiber Optic Installer (FOI) examination. This important industry certification is portable, valid for four years, renewable and recognized worldwide as an indicator of professional competence. When thus employed, it includes an aggressive test preparation component with 150 practice questions and examples that reinforce and unify the theory and lab exercises into a keener understanding of the fiber optics field. The FOI examination can be included in the course fees and administered on the last day of the class.

Customize It:

With onsite Training, courses can be scheduled on a date that is convenient for you, and because they can be scheduled at your location, you don’t incur travel costs and students won’t be away from home. Onsite classes can also be tailored to meet your needs. You might shorten a 5-day class into a 3-day class, or combine portions of several related courses into a single course, or have the instructor vary the emphasis of topics depending on your staff’s and site’s requirements.

Fiber Optics Training | LightMaster TrainingRelated Courses:

Duration: 4-5 days

Objectives:

◾Understand the theory of fiber optic transmission
◾Describe the components of a fiber optic link
◾Perform validation testing and troubleshooting using fiber optic test and measurement equipment
◾Perform cable preparation, termination, and splicing
◾(Optional) Prepare and sit for the Fiber Optic Installer (FOI) examination, a portable and industry standard certification administered by Electronic Technicians Association International (ETA-I).

Course Content:

Fiber to the Home (FTTH) Architecture
◾Fiber Pair Gain Systems
◾Deployment Options
◾Passive Optical Network (PON)

The Basics of Fiber Optics
◾Advantages of Fiber Optics over Copper Cabling
◾Frequency, Wavelength, and the Speed of Light
◾The Electromagnetic Spectrum
◾Reflection and Refraction
◾Index of Refraction
◾Total Internal Reflection

Optical Waveguides
◾Numerical Aperture
◾Multimode and Singlemode Fibers
◾Step and Graded Index Profiles

Transmission Characteristics
◾Attenuation
◾Macrobending and Microbending
◾Dispersion
◾Gain/Bandwidth Product

Optical Link Components
◾Light Sources (LED, VCSEL, Laser)
◾Photodiode Receivers (PIN, APD)
◾Indoor and Outdoor Cables (Tight Buffer, Loose Tube)
◾Connectors (ST, SC, FC, LC)
◾Optical Splitters
◾Splices (Fusion and Mechanical)

System Design
◾Decibel and Percentage Gain and Loss
◾Loss Budget
◾Link Loss Calculation
◾System Margin

Safety Procedures
◾Fiber Handling and Disposal
◾Laser Classes
◾Chemical Handling

Termination Methods
◾Cable Preparation
◾Connector Styles
◾Epoxy, Crimp, Pre-loaded, Chemical, UV-Curable
◾Cleaving and Preparation
◾Polishing and Visual Inspection
◾Splicing (Fusion and Mechanical)

Test and Measurement Equipment
◾Visual Fault Locator
◾Optical Loss Testing
◾Optical Time Domain Reflectometer (OTDR)
◾Testing Methodologies (Fiber Optic Test Procedures)

Fiber Optic Installer Examination Preparation
◾Practice Questions and Exercises
◾Group Preparation
◾Test Administration

Laboratory Exercises

Request More Information

Time Frame: 0-3 Months4-12 Months

No Comments Yet.

Leave a comment