SAP Basic Data for Manufacturing and Product Management Training (PLM114-v015)

SAP Basic Data for Manufacturing and Product Management Training (PLM114-v015)

Introduction:

SAP Basic Data for Manufacturing and Product Management Training (PLM114-v015) Onsite and Public Classes

Course based on software release:

ERP 6.0 EhP7

SAP Basic Data for Manufacturing and Product Management Training (PLM114-v015)Related Courses:

Duration: 5 days

Prerequisites:

Essential:
-SAPSCM100
-PLM100

Customize It:

With onsite Training, courses can be scheduled on a date that is convenient for you, and because they can be scheduled at your location, you don’t incur travel costs and students won’t be away from home. Onsite classes can also be tailored to meet your needs. You might shorten a 5-day class into a 3-day class, or combine portions of several related courses into a single course, or have the instructor vary the emphasis of topics depending on your staff’s and site’s requirements.

Audience / Target Group:

Application Consultant
Data Consultant / Manager
Program / Project Manager
Business Analyst
User
Business Process Owner / Team Lead / Power User

Course Content:

Accessing and Creating Types of Data
Using Organizational Elements and Master Data in Production
Creating a Plant in SAP ERP
Creating a Storage Location in SAP ERP
Creating MRP Areas
Describing the Structure of the Material Master Record
Maintaining Prerequisites for Creating Material Masters
Creating a Material Master Record
Classifying Material Master Records
Managing the Material Master
Describing the Structure of the Bill Of Material
Managing the Validity of BOMs
Managing Bills of Material
Using ECM to Change BOMs
Analyzing Bills of Material
Configuring Bills of Material
Describing the Structure of Master Data
Creating Work Centers
Creating Capacities in the Work Center
Integrating Costing with the Work Center
Describing the Structure of the Task List
Creating Material Assignments and Component Allocations
Creating Suboperations and User-Defined Fields
Analyzing and Changing Task Lists
Describing Phantom Assemblies
Creating Co-Products and By-Products
Creating Alternative Components
Creating Multiple BOMs
Creating Variant BOMs
Using Mass Change and the Product Structure Browser
Modeling Complex and Flexible Manufacturing
Modeling Alternative Manufacturing Processes
Creating Reference Operation Sets
Using Lead-Time Scheduling to Update the Material Master
Scheduling Time Elements and Reduction in the Routing
Creating Trigger Points
Using Scrap in the Routing
Creating Production Resources and Tools
Describing the Structure of the Engineering Workbench
Setting the Work Area, Selection Criteria, and Effectivity Window
Navigating in the Engineering Workbench
Creating Engineering Workbench Work Areas
Using the PLM Web User Interface
Using Status and Action Management
Synchronizing BOMs using Guided Structure Synchronization
Tracking Changes in BOMs Using Redlining

Request More Information

Time Frame: 0-3 Months4-12 Months

No Comments Yet.

Leave a comment