Spacecraft Systems Integration & Test Training

Spacecraft Systems Integration & Test Training

Introduction:

Spacecraft Systems Integration & Test Training Course Description

This four-day Spacecraft Systems Integration & Test Training is designed for engineers and managers interested in a systems engineering approach to space systems integration, test and launch site processing. It provides critical insight to the design drivers that inevitably arise from the need to verify and validate complex space systems. Each topic is covered in significant detail, including interactive team exercises, with an emphasis on a systems engineering approach to getting the job done. Actual test and processing facilities/capabilities at GSFC, VAFB, CCAFB and KSC are introduced, providing familiarity with these critical space industry resources.

Spacecraft Systems Integration & Test TrainingRelated Courses:

Duration:4 days

Skills Gained:

• How are systems engineering principals applied to system test?
• How can a comprehensive, realistic & achievable schedule be developed?
• What facilities are available and how is planning accomplished?
• What are the critical system level tests and how do their verification goals drive scheduling?
• What are the characteristics of a strong, competent I&T team/program?
• What are the viable trades and options when I&T doesn’t go as planned?

Customize It:

With onsite Training, courses can be scheduled on a date that is convenient for you, and because they can be scheduled at your location, you don’t incur travel costs and students won’t be away from home. Onsite classes can also be tailored to meet your needs. You might shorten a 5-day class into a 3-day class, or combine portions of several related courses into a single course, or have the instructor vary the emphasis of topics depending on your staff’s and site’s requirements.

Course Content:

System Level I&T Overview. Comparison of system, subsystem and component test. Introduction to the various stages of I&T and overview of the course subject matter.

Main Technical Disciplines Influencing I&T. Mechanical, Electrical and Thermal systems. Optical, Magnetics, Robotics, Propulsion, Flight Software and others. Safety, EMC and Contamination Control. Resultant requirements pertaining to I&T and how to use them in planning an effective campaign.

Lunar/Mars Initiative and Manned Space Flight. Safety first. Telerobotics, rendezvous & capture and control system testing (data latency, range sensors, object recognition, gravity compensation, etc.). Verification of multi-fault-tolerant systems. Testing ergonomic systems and support infrastructure. Future trends.

Staffing the Job. Building a strong team and establishing leadership roles. Human factors in team building and scheduling of this critical resource.

Test and Processing Facilities. Budgeting and scheduling tests. Ambient, environmental (T/V, Vibe, Shock, EMC/RF, etc.) and launch site (VAFB, CCAFB, KSC) test and processing facilities. Special considerations for hazardous processing facilities.

Ground Support Systems. Electrical ground support equipment (GSE) including SAS, RF, Umbilical, Front End, etc. and Mechanical GSE, such as stands, fixtures and 1-G negation for deployments and robotics. I&T ground test systems and software. Ground Segment elements (MOCC, SOCC, SDPF, FDF, CTV, network & flight resources).

Preparation and Planning for I&T. Planning tools. Effective use of block diagrams, exploded views, system schematics. Storyboard and schedule development. Configuration management of I&T, development of C&T database to leverage and empower ground software. Understanding verification and validation requirements.

System Test Procedures. Engineering efficient, effective test procedures to meet your goals. Installation and integration procedures. Critical system tests; their roles and goals (Aliveness, Functional, Performance, Mission Simulations). Environmental and Launch Site test procedures, including hazardous and contingency operations.

Data Products for Verification and Tracking. Criterion for data trending. Tracking operational constraints, limited life items, expendables, trouble free hours. Producing comprehensive, useful test reports.

Tracking and Resolving Problems. Troubleshooting and recovery strategies. Methods for accurately documenting, categorizing and tracking problems and converging toward solutions. How to handle problems when you cannot reach closure.

Milestone Progress Reviews. Preparing the I&T presentation for major program reviews (PDR, CDR, L-12, Pre-Environmental, Pre-ship, MRR).

Subsystem and Instrument Level Testing. Distinctions from system test. Expectations and preparations prior to delivery to higher level of assembly.

The Integration Phase. Integration strategies to get the core of the bus up and running. Standard Operating Procedures. Pitfalls, precautions and other considerations.

The System Test Phase. Building a successful test program. Technical vs. schedule risk and risk management. Establishing baselines for performance, flight software, alignment and more. Environmental Testing, launch rehearsals, Mission Sims, Special tests.

The Launch Campaign. Scheduling the Launch campaign. Transportation and setup. Test scenarios for arrival and check-out, hazardous processing, On-stand and Launch day. Contingency planning and scrub turn-arounds.

Post Launch Support. Launch day, T+. L+30 day support. Staffing logistics.

I&T Contingencies and Work-arounds. Using your schedule as a tool to ensure success. Contingency and recovery strategies. Trading off risks.

Summary. Wrap up of ideas and concepts. Final Q & A session.

Request More Information

Time Frame: 0-3 Months4-12 Months

No Comments Yet.

Leave a comment